Generator
(North)

The Planet’s electrical infrastructure is broken into three primary zones within the datacenter (A, B, C). Zone A services ˝ of the datacenter with electricity. Zone B services the remaining ˝ of the datacenter and Zone C overlays the entire datacenter creating a complete redundancy in electricity allowing for the 100% uptime SLA. Our north generator is a 1.5 Megawatt – 16 cylinder diesel generator sitting atop a 2500 gallon diesel tank. This generator supplies electricity for zones A and B and has a maximum runtime of 15 days with onsite fuel. Offsite fuel contracts have SLA requirements of 4 hours for a refuel. Diesel generators can run indefinitely and are monitored by our DATATRAX™ monitoring system.


<< Back   Next >>